
The Biden-Harris green crown jewel just shattered — literally
July 24, 2024
A major offshore-wind-power project approved by the Biden-Harris administration was shuttered last week after a turbine dramatically shattered, spewing sharp fiberglass shards onto nearby beaches and into the Atlantic Ocean.